摘要 |
A new steam turbine generation set is disclosed, which at least includes boiler which has an overheating device (11, 13, 15) and a reheating device (12, 16) therein, a connection zone (17) of connection box is located on the boiler corresponding to the connection box for the steam outlets and inlets of overheating device and reheating device; a steam tubing system includes at least a tube (31) which communicates the boiler with a high pressure cylinder (211) and an intermediate pressure cylinder (212) and feeds steam which has high pressure and high temperature; the highly located shaft system consists of the high pressure cylinder and a generator (41) and is positioned outside the boiler near the connection zone of the connection box. Further, the new steam turbine generation set may also include a lowly located shaft system which is positioned at the lower location. |