摘要 |
A first crossing predictor uses signals from a pair to spaced apart receivers, which may be located on opposite sides of a transmitter, to determine on which side of a crossing an approaching train is located. If the first predictor upstream with respect to the approaching train, the first predictor transmits signals to instruct a downstream adjacent predictor to activate its warning device at a constant warning time (referred to as DAXing). |