摘要 |
PROBLEM TO BE SOLVED: To provide a working platform which facilitates assembly thereof at the site (working site) in a very short time, and allowed removal thereof from the site (working site) after completion of construction work. SOLUTION: The working platform 10 consists of working platform units. Each working platform unit consists of: a first frame body 11 formed by connecting a plurality of vertical supports 1 spaced an interval away from each other in a depth direction, by connection members 3; a second frame body 12 formed by connecting the vertical supports spaced the interval away from each other in the depth direction corresponding to the vertical supports of the first frame body, by the connection members; and connection members 2, 2a foldably connecting between the first frame body and the second frame body in a width direction orthogonal to the depth direction. Then the working platform units thus formed are arranged side by side in the width direction and loaded in a carrying vehicle in a folded state to be transported to the working site where the working platform is used. At the working site, a folding portion of each platform unit is extended, and the connection members 2, 2a are connected to the frame bodies. Further a space between the working platform units is extended in the width direction, and the working platform units are connected together by the connection members 2a, to thereby construct the working platform 10. COPYRIGHT: (C)2009,JPO&INPIT
|