发明名称 POWER LOSS PACKET PRIORITY
摘要 <P>PROBLEM TO BE SOLVED: To provide management of power loss situations in a utility grid. <P>SOLUTION: There is provided an advanced metering infrastructure (AMI) (10) enabled device (22, 40), program product, and communication system (26, 44). The AMI (10) enabled device (22, 40) is described that includes a power failure detection system (24, 42) that constructs a power loss message in response to a detected loss of power and the communication system (26, 44) for transmitting messages over a network. The communication system includes: a prioritization system (28, 48) for prioritizing the power loss message as a high priority message; and a queuing system (31, 50) that ensures that the power loss message is transmitted ahead of all low priority messages. <P>COPYRIGHT: (C)2013,JPO&INPIT
申请公布号 JP2012205303(A) 申请公布日期 2012.10.22
申请号 JP20120061320 申请日期 2012.03.19
申请人 GENERAL ELECTRIC CO <GE> 发明人 BRADLEY RICHARD REE;AJAY PAL SINGH GREWAL;THOMAS CLAYTON MAYO
分类号 H04L12/56;H04Q9/00 主分类号 H04L12/56
代理机构 代理人
主权项
地址