发明名称 FORECASTING OIL PRODUCTION FOR MULTIPLY-FRACTURED HORIZONTAL WELLS
摘要 Methods, computing systems, and computer-readable media for forecasting oil recovery from a well. The method includes obtaining bottom-hole pressures, production rates, and a reservoir pressure for the well, and calculating pressure normalized rates based thereon. The method also includes forecasting a forecasted bottom-hole pressure for a first material balance time, based on the plurality of bottom-hole pressures, and forecasting a forecasted pressure normalized rate for the first material balance time based on the pressure normalized rates. The method further includes calculating a forecasted production rate for the first material balance time, based on the production rates, and determining a first forecasted cumulative production at the first material balance time based on the forecasted production rate, bottom-hole pressure, and pressure normalized rate, and converting the first material balance time to a first real time based at least partially on the forecasted cumulative production and production rate.
申请公布号 US2015331976(A1) 申请公布日期 2015.11.19
申请号 US201414575442 申请日期 2014.12.18
申请人 Schlumberger Technology Corporation 发明人 Tao Qingfeng
分类号 G06F17/50;G06F17/10 主分类号 G06F17/50
代理机构 代理人
主权项 1. A method for forecasting oil recovery from a well, comprising: obtaining a plurality of bottom-hole pressures, a plurality of production rates, and a reservoir pressure for the well; calculating a plurality of pressure normalized rates based at least partially on the plurality of bottom-hole pressures, the plurality of production rates, and the reservoir pressure; forecasting a forecasted bottom-hole pressure for a first material balance time, based on the plurality of bottom-hole pressures; forecasting a forecasted pressure normalized rate for the first material balance time based at least partially on the plurality of pressure normalized rates; calculating a forecasted production rate for the first material balance time, based on the plurality of production rates; determining a first forecasted cumulative production at the first material balance time based on the forecasted production rate, the forecasted bottom-hole pressure, and the forecasted pressure normalized rate; and converting, using a processor, the first material balance time to a first real time based at least partially on the forecasted cumulative production and the forecasted production rate.
地址 Sugar Land TX US