发明名称 |
BUILDING CONSTRUCTION METHOD, AND BUILDING |
摘要 |
<p>PROBLEM TO BE SOLVED: To shorten a construction period of a building by securing traffic lines within a construction area in a construction site where a construction passage and a construction doorway are hard to secure around the construction area.SOLUTION: The construction method includes a first process for securing a construction passage within a construction area, and a second process for building a structure above the construction passage, leaving the construction passage as it is.</p> |
申请公布号 |
JP2015183386(A) |
申请公布日期 |
2015.10.22 |
申请号 |
JP20140058778 |
申请日期 |
2014.03.20 |
申请人 |
TAKENAKA KOMUTEN CO LTD |
发明人 |
SEKI KATSUHIRO;ISHIHARA KIYOTAKA;KAWANO SHOHEI;HAYASHI MASAAKI;YOSHIMURA SHIGEHISA;MIWA TAKAYUKI;ITO TOSHIHIRO;YOSHIMURA MASAO;TOYOMAKI SHINGO;MATSUNAGA YUKI;NATSUME SHOHEI |
分类号 |
E04G21/14 |
主分类号 |
E04G21/14 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|