发明名称 CONSTRUCTION METHOD FOR FOUNDATION PILE
摘要 PROBLEM TO BE SOLVED: To provide a construction method for a foundation pile, which can inexpensively reinforce a pile head part in a relatively easy manner. SOLUTION: A hollow pile 30 filled with cement milk is erected in an excavated hole 40 by various types of known buried-pile construction methods employing a hollow prefabricated pile (Fig. 11 (A)). When slime and the cement milk, existing in the hollow space 32 of the hollow pile 30, are in a liquid or gel state, the slime and/or the cement milk in the hollow space 32 to an arbitrary depth are/is removed by using a removal vessel 10 etc.; an in-pile lid body 74 is arranged on the bottom of the hollow space 32 which is produced by the removal of the slime and/or the cement milk; and freshly mixed concrete is infilled on the in-pile lid body 74. COPYRIGHT: (C)2007,JPO&INPIT
申请公布号 JP2007217887(A) 申请公布日期 2007.08.30
申请号 JP20060036919 申请日期 2006.02.14
申请人 HARIMA SHOJI:KK;YAMAMOTO NAOYUKI 发明人 HARIMA YOSHITO;YAMAMOTO NAOYUKI
分类号 E02D5/24 主分类号 E02D5/24
代理机构 代理人
主权项
地址