UNDERGROUNDING STRUCTURE OF CONNECTOR FOR CONCRETE STRUCTURE'S PULL-OUT TESTING APPARATUS AND CONSTRUCTION METHOD FOR THE CONCRETE STRUCTURE
摘要
A connector busying structure of a concrete structure drawing testing device and a construction method of the concrete structure are provided to bury the connector without any damage on a mold by burying the connector while supporting with a channel. A connector busying structure of a concrete structure drawing testing device comprises a temporary cover(30) and a channel(40). The temporary cover is detachably installed at a connector(10). The temporary cover opens and closes an insertion part(12) of the connector. The insertion part of the connector is screwed up with a test piece. The connector comprises a hook part(14) for the separation protection from the concrete structure. The channel is temporary mounted at a mold(4) of the concrete structure. The channel supports one or more connectors.
申请公布号
KR20090092974(A)
申请公布日期
2009.09.02
申请号
KR20080018255
申请日期
2008.02.28
申请人
INDUSTRY-ACADEMIC COOPERATION FOUNDATION, YONSEI UNIVERSITY;BARO CONSTRUCTION KEY/TECHNOLOGY CO., LTD.
发明人
LEE, GHANG;WON, JONG SUNG;KWON, TAE WOO;YOON, SANG MOON