摘要 |
PROBLEM TO BE SOLVED: To complete execution of desired processing even when the execution of the other program using resources is overlapped during the real operation of verified software (program). SOLUTION: When performing preliminary verification of performance of software which is scheduled to be mounted on equipment 1000 for the real operation, equipment 2000 for verification performs the preliminary verification of software performance under the consideration of the real operating situations in the equipment 1000 for a real operation. Specifically, the equipment 2000 for verification collects and stores resource usage information in the normal operation of the equipment 1000 for a real operation by a log information reading part 2120 in advance, and an operation information reproduction part 2140 controls processing of the equipment 2000 for verification so that the resource usage in the equipment 2000 for verification can be made equal to the stored resource usage. In this state, a test execution part 2150 executes preliminarily verification object software. COPYRIGHT: (C)2011,JPO&INPIT |