发明名称 Holder for measuring permeability of unconsolidated sediment
摘要 Disclosed is a holder for measuring a permeability of an unconsolidated sediment. The holder includes a sediment installation part having a solid sediment attached to opposite ends of an unconsolidated sediment along a longitudinal direction; a transverse pressure supply part installed to surround the sediment installation part to supply a predetermined transverse pressure to the sediment installation part by using a fluid supplied from the outside; and a longitudinal pressure supply part installed at opposite ends of the transverse pressure supply part to cover opposite ends of the sediment installation part to be moved along a vertical direction so as to supply a predetermined longitudinal pressure to the sediment installation part.
申请公布号 US9128021(B2) 申请公布日期 2015.09.08
申请号 US201213657697 申请日期 2012.10.22
申请人 Korea Institute of Geoscience and Mineral Resources 发明人 Oh Jun-Ho;Kim Kue-Young;Kim Tae-Hee
分类号 G01N15/08;G01N33/24 主分类号 G01N15/08
代理机构 Christie, Parker & Hale, LLP 代理人 Christie, Parker & Hale, LLP
主权项 1. A holder for measuring a permeability of an unconsolidated sediment in order to prevent the unconsolidated sediment from being deformed, the holder comprising: a sediment installation part having a solid sediment attached to opposite ends of an unconsolidated sediment along a longitudinal direction; a transverse pressure supply part installed to surround the sediment installation part to supply a predetermined transverse pressure to the sediment installation part by using a fluid supplied from an outside; and a longitudinal pressure supply part installed at opposite ends of the transverse pressure supply part to cover opposite ends of the sediment installation part and moved along a vertical direction so as to supply a predetermined longitudinal pressure to the sediment installation part, wherein the fluid is an oil having a predetermined viscosity, wherein the sediment installation part comprises: a flexible sleeve having open upper and lower ends and formed therein with an installation space where the unconsolidated sediment and the solid sediment are installed;an upper end plug installed at an upper end of the sleeve to press the solid sediment provided at an upper side, and having a gas discharge pipe; anda lower end plug installed at an upper end of the sleeve to press the solid sediment provided at a lower side, and having a gas injection pipe, and wherein the transverse pressure supply part comprises: an outer pipe spaced apart from an outer periphery of the sleeve by a predetermined gap and surrounding the sleeve;a fluid introduction part formed at one side of the outer pipe and into which a fluid is introduced from the outside; anda fluid control part formed at an opposite side of the outer pipe to control a hydraulic pressure of the introduced fluid with a predetermined hydraulic pressure, and wherein the longitudinal pressure supply part comprises: an upper end fixing part installed at an upper end of the outer pipe such that one end of the upper end plug is fixed thereto; anda lower end fixing part installed at a lower end of the outer pipe such that one end of the lower end plug is fixed thereto,wherein a nut part is screw-coupled with at least one of the upper fixing part and the lower fixing part to move the upper end plug or the lower end plug in a longitudinal direction.
地址 Yuseong-Gu KR