摘要 |
<p>One of the following bonding steps is performed: a first bonding step in which an inner contact section (48) of a roof bow (40) is not bonded to a roof-bow-contacting section (18) of a side roof rail (10) but an outer contact section (49) of the roof bow (40) is bonded to a roof-panel contact section (22) of a roof panel (20); or a second bonding step in which the aforementioned outer contact section (49) is not bonded to the roof-panel contact section (22) of the roof panel (20) but the aforementioned inner contact section (48) is bonded to the roof-bow-contacting section (18). Also, the part of the top surface of an inner bonding end (10a) of the side roof rail (10) that is not in contact with the abovementioned outer contact section (49) is bonded to the bottom surface of the roof-panel contact section (22) of the roof panel (20).</p> |