发明名称 |
METHOD OF TREATING A SUBTERRANEAN FORMATION |
摘要 |
A method of treating a subterranean formation, involving performing a fracturing operation and performing a shut in. At a time before or after the shut in is commenced, changes in properties at or near a fracture are estimated based upon monitored data. A plugging agent is injected taking into consideration the estimated changes in properties. |
申请公布号 |
US2015159477(A1) |
申请公布日期 |
2015.06.11 |
申请号 |
US201314103203 |
申请日期 |
2013.12.11 |
申请人 |
Schlumberger Technology Corporation |
发明人 |
Lecerf Bruno;Kraemer Chad;Usoltsev Dmitriy;Bogdan Andrey |
分类号 |
E21B43/26;E21B47/00;E21B33/13 |
主分类号 |
E21B43/26 |
代理机构 |
|
代理人 |
|
主权项 |
1. A method of treating a subterranean formation penetrated by a wellbore comprising:
performing a fracturing operation by introducing a treatment fluid into the wellbore at a fluid pressure equal to or greater than a fracture initiation pressure of the subterranean formation to induce a fracture in the subterranean formation; estimating changes in fracture geometry by monitoring data from one or more sensors while the fracture is open; performing a shut-in by stopping injection of the treatment fluid; and introducing a plugging agent, after performing the shut-in, plugging the induced fracture; wherein the plugging agent is introduced after a period of time, the period of time being determined based upon the monitored data. |
地址 |
Sugar Land TX US |