摘要 |
This invention relates to a grouting construction method of a waterside structure, and grout used for the same. The grouting construction method according to the present invention is to prevent water penetration by filling pores inside a waterside structure constructed by piling up. The grouting construction method is forming perforated holes by perforating the waterside structure, and injecting grout containing a cement admixture and a high molecular thickener through the perforated holes. The high molecular thickener is mixed with 60-90 wt% of a chelate resin, 5-20 wt% of water, 0.05-5 wt% of a stabilizer, and 1-30 wt% of a rapid-hardening material, and optionally with 1-5 wt% of a high-range water-reducing agent, 0.1-1 wt% of a preservative and 0.1-1 wt% of an antifoaming agent. |
申请人 |
DAEWOO ENGINEERING & CONSTRUCTION CO., LTD.;JOIN THE NEW TECHNOLOGY INC. CO., LTD. |
发明人 |
NOH, JAE HO;HEO, HYUNG SEOK;LEE, TAE KYUNG;LEE, JEONG IN;KIM, YOUNG JIN;KIM, IN GYU;CHA, KYUNG SUB;KIM, SEON JU |