发明名称 SYSTEMS AND METHODS FOR PRODUCING GAS WELLS WITH MULTIPLE PRODUCTION TUBING STRINGS
摘要 <p>A system (100) for producing hydrocarbons from a subterranean well (120) including a wellbore (126) extending from a surface (15) into a subterranean formation (130), the system including a wellhead (13) disposed at the surface. In addition, the system includes a production tree (12) coupled to the wellhead. Further, the system includes a casing (122) coupled to the wellhead and extending into the wellbore. Still further, the system includes a first plurality of production tubing strings (142, 144) extending into the casing from the wellhead to a first production zone (132'). Each of the first plurality of production tubing strings is configured to provide a fluid flow path for gases from the first production zone. The production tree (12) is configured to selectively and independently control fluid flow through each of the first plurality of production tubing strings.</p>
申请公布号 WO2015017220(A1) 申请公布日期 2015.02.05
申请号 WO2014US47882 申请日期 2014.07.23
申请人 BP CORPORATION NORTH AMERICA INC.;AMAN, MICHAEL, ELGIE;EDWARDS, PAUL, A.;IDSTEIN, TIMOTHY 发明人 AMAN, MICHAEL, ELGIE;EDWARDS, PAUL, A.;IDSTEIN, TIMOTHY
分类号 E21B43/12 主分类号 E21B43/12
代理机构 代理人
主权项
地址