发明名称 METHOD OF CONSTRUCTING TRUSS STRUCTURE
摘要 <p>The present invention relates to a temporary assembly jig and a method to construct a steel pipe truss structure using the same. According to the present invention, each of multiple connectors to connect an upper member and a lower member consists of three members which are a web member, which is a diagonal member (or a vertical member), and first and second steel pipe brackets. Moreover, the temporary assembly jig is capable of butt welding the web member, and the first and second steel pipe brackets in the correct position later by temporary assembling to fit three members on the center when one end of the first and second steel pipe brackets is in contact with the outer circumferential surface of the upper member and the lower member.</p>
申请公布号 KR101485101(B1) 申请公布日期 2015.01.22
申请号 KR20140073997 申请日期 2014.06.18
申请人 HAISUNG ENGINEERING CO., LTD. 发明人 MOON, SAM SUB
分类号 B23K37/04 主分类号 B23K37/04
代理机构 代理人
主权项
地址