摘要 |
The method involves providing a substructure having a crushed stone layer (11) and soil layers (10), and expanding the crushed stone layer, where new crushed stones are installed for the new crushed stone layer. The soil layer is expanded using a lifting device (8). New soil material is installed for the new soil layers. |