发明名称 Steam Turbine Power Plant
摘要 Disclosed is a steam turbine power plant adapted to start operating very efficiently by highly accurate look-ahead control of a plurality of its startup constraints. The power plant includes a fundamental startup constraint prediction device 32 that calculates from a control input variable of the controller 12, 14 a prediction period about a fundamental startup constraint which is short in response time, a reference control input variables calculating device 33 that calculates such a reference control input variable of the controller 12, 14 as the value predicted and calculated by the fundamental startup constraint prediction device 32 will not exceed a limit value, other startup constraint prediction devices 35a, 35b each calculating a corresponding prediction period of data about desired one of other startup constraints from the prediction period of reference control input variables data, other control input variable calculating devices 36a, 36b each calculating corresponding other control input variables of the controller 12, 14 from the value predicted and calculated by the other startup constraint prediction device 35a, 35b, and a control signal output device 40, 41, 42 or 43 that outputs a command value to the controller 12, 14 in accordance with a value selected from the reference control input variable and the other control input variable.
申请公布号 US2014290250(A1) 申请公布日期 2014.10.02
申请号 US201314079892 申请日期 2013.11.14
申请人 Hitachi, Ltd. 发明人 YOSHIDA Yasuhiro;YOSHIDA Takuya;YASHIKI Tatsuro;NOMURA Kenichiro;YAMANAKA Kazunori;TOMIZAWA Masaaki;TAKAHASHI Yuichi;SUZUKI Fumiyuki
分类号 F01D19/02 主分类号 F01D19/02
代理机构 代理人
主权项 1. A steam turbine power plant, comprising: a heat source equipment that heats a low-temperature flow by applying a heat medium and thus generates a high-temperature flow; a steam generator that generates steam using the high-temperature flow generated by the heat source equipment; a steam turbine driven by the steam generated by the steam generator; an electric generator that converts rotational motive power of the steam turbine into electric power; a controller that controls a plant load; and a steam turbine starting control device that predicts a value of a startup constraint due to a change in physical quantities of the steam in the steam turbine, and controls the controller according to the predicted value; wherein the steam turbine starting control device includes: at least one fundamental startup constraint prediction device calculating from a control input variable of the controller a prediction period of fundamental startup constraint data about a fundamental startup constraint which is short in response time with respect to the change in the physical quantities of the steam; at least one reference control input variables calculating device calculating such a reference control input variable of the controller as the value predicted and calculated by the fundamental startup constraint prediction device will not exceed a corresponding limit value; at least one other startup constraint prediction device calculating a corresponding prediction period of data about one of other startup constraints longer than the fundamental startup constraint in response time, from the prediction period of reference control input variables data; at least one other control input variables calculating device calculating such an other control input variable of the controller as the value predicted and calculated by the corresponding other startup constraint prediction device will not exceed a corresponding limit value; and a control signal output device that outputs a command value to the controller according to a value selected from the reference control input variable and the other control input variable.
地址 Tokyo JP