发明名称 WIND TURBINE TOWER ERECTING SYSTEM
摘要 In certain embodiments, a tower lifting system comprises a primary lifting system and a secondary lifting system. The primary lifting system includes a lift cap configured to support a tower section to be lifted, the lift cap having a first plurality of hoists, and a lift pole coupled to the lift cap, the lift pole having a lifting mechanism configured to lift the lift cap, the lift pole, and the tower section to be lifted from within a previously lifted tower section. The secondary lifting system comprises a second plurality of hoists configured to raise the tower section to be lifted to the lift cap from a tower foundation.
申请公布号 KR20140116483(A) 申请公布日期 2014.10.02
申请号 KR20147022288 申请日期 2013.01.17
申请人 ILLINOIS TOOL WORKS INC. 发明人 JONES JERALD EDWARD;RHOADES VALERIE LISA
分类号 F03D11/04;E04H12/34;F03D1/00 主分类号 F03D11/04
代理机构 代理人
主权项
地址