摘要 |
PROBLEM TO BE SOLVED: To prevent connecting friction and disconnection that are caused when connecting a divided rebar cage and being erected as a connecting rebar cage body.SOLUTION: A connecting erection method includes the steps of: erecting a first stage of a divided rebar cage 1 to a vertical pile 2 and adjacently holding and fixing connection parts 4 of the divided rebar cage 1 of a second stage; holding and fixing immediate reinforcement frames 8 to the first stage and the second stage together with connecting members 19 so as to be bridged astride them; also forming locking connecting members 21 in which the connecting members 19 have hooking parts 20 at both ends, and hooking and bridging the reinforcement frames 8 together to fix and hold it; and holding and fixing the connecting members 19 bridged to each reinforcement frame 8 between both ends of the divided rebar cage 1 as extended connecting members 22, and holding and fixing by being extended to the reinforcement frame 8 of the divided rebar cage 1 of the next stage, and thereby forming each stage into the integrated connecting rebar cage body 1a. Accordingly, the divided rebar cage 1 holds and fixes adjacent immediate reinforcement frames 8 being bridged together with the connecting members 19, the locking connecting members 21 or the extended connecting members 22, and thereby the integrated connecting rebar cage body 1a is formed. |