发明名称 Device for determining build-to-order production process, program, system for determining build-to-order production process, and method for determining build-to-order production process
摘要 A build-to-order production process is determined in consideration of magnitude of demand. A lead time calculating section (122) calculates process-specific lead time proportional to the time at which the number of items required to produce the amount of demand for products which are periodically ordered is processed for each process of manufacturing a product and selects a process in the range in which the sum value after the calculated process-specific lead time is added to the travel time between the processes does not exceed the lead time permissible by the client as a build-to-order selection process.
申请公布号 US8731700(B2) 申请公布日期 2014.05.20
申请号 US200913143559 申请日期 2009.01.07
申请人 FUNAKI KENICHI;HITACHI, LTD. 发明人 FUNAKI KENICHI
分类号 G06F19/00 主分类号 G06F19/00
代理机构 代理人
主权项
地址