发明名称 |
Power plant building assembly, in particular coal power plant building assembly |
摘要 |
<p>The arrangement has a machine house (1) receiving power plant components that are selected from steam turbines, generators, feed water pumps, capacitors and high pressure pre-heaters. A boiler house (2) receives heating steam boilers and components, and a connection component (7) is provided between the machine and the boiler house for receiving high pressure pipe lines that are connected with plant components. The connection component is designed as concrete construction in reinforced concrete and formed in homogeneous in-situ concrete and heavy reinforced concrete prefabricated structures.</p> |
申请公布号 |
EP2634384(A2) |
申请公布日期 |
2013.09.04 |
申请号 |
EP20130154990 |
申请日期 |
2013.02.12 |
申请人 |
ENVI CON & PLANT ENGINEERING GMBH |
发明人 |
KROMBHOLZ, SEBASTIAN;ZUERN, RAINER;SCHMIDT, JUERGEN |
分类号 |
F01K13/00 |
主分类号 |
F01K13/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|