发明名称 |
METHOD OF ESTIMATING RESOURCE QUANTITY PER UNIT FOR BLOCK ASSEMBLY |
摘要 |
<p>PURPOSE: A method for estimating a man-hour of a quantity per unit of block assembly work is provided to supply the man-hour of the quantity per unit which is close to a real work man-hour, thereby easily making maintenance. CONSTITUTION: A standard structure of a vessel in which a block is located through assembly work or the block corresponding to a location in the vessel is defined(201). A standard shape of the block is classified and defined corresponding to the shape of the block(202). A standard curvature of the block is classified and defined corresponding to a curvature of the block(203). A coefficient value of a quantity per unit is generated based on the standard structure, the standard shape, the standard curvature(204). A man-hour of the quantity per unit is calculated based on the coefficient value of the quantity per unit(205). [Reference numerals] (201) Defining the standard structure of a block; (202) Defining the standard shape of the block; (203) Defining the standard curvature of the block; (204) Generating a coefficient value of a quantity per unit based on the standard structure, the standard shape, and the standard curvature; (205) Calculating a man-hour of the quantity per unit; (AA) Start; (BB) End</p> |
申请公布号 |
KR20130026068(A) |
申请公布日期 |
2013.03.13 |
申请号 |
KR20110089445 |
申请日期 |
2011.09.05 |
申请人 |
HYUNDAI HEAVY INDUSTRIES CO., LTD. |
发明人 |
LEE, HWA JUNG;KIM, SA HOON |
分类号 |
G06F19/00;G06Q10/06;G06Q50/04 |
主分类号 |
G06F19/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|