发明名称 TUNNEL CONSTRUCTING METHOD USING DOUBLE EXCAVATION METHOD
摘要 PURPOSE: A tunnel construction method using a double-excavation method is provided to minimize vibration and noise transferred to the ground when a tunnel is excavated. CONSTITUTION: A tunnel construction method using a double-excavation method is as follows. A lower pre-excavation part(110) is excavated along the longitudinal direction of a tunnel. A residual tunnel part located at the top of the lower pre-excavation part is excavated. Muck falling to the lower pre-excavation part when the residual tunnel part is excavated is removed.
申请公布号 KR20120063210(A) 申请公布日期 2012.06.15
申请号 KR20100124289 申请日期 2010.12.07
申请人 KOREA TWO ARCH CO., LTD. 发明人 PARK, JAE HYUN
分类号 E21D9/00 主分类号 E21D9/00
代理机构 代理人
主权项
地址