摘要 |
<P>PROBLEM TO BE SOLVED: To obtain a running curve generating apparatus and a running curve evaluating method, allowing improvement of efficiency in review work of a running curve. <P>SOLUTION: The running curve generating apparatus includes: a running curve generating section 6 which generates a planned running curve based on running curve generating conditions in planning running and line information regarding a running plan object line and prepares an actual running curve based on actual running data of a train and the line information; a difference evaluation processing section 8 which compares the planned running curve and the actual running curve, calculates the difference between a planned operation position as an operation position on the running plan and an actual operation position as an operation position during actual running for every operation item including notch operations and braking operations, evaluates necessity of reviewing for every operation item, and generates difference evaluation information associating the operation items, the planned operation position, the actual operation position, the difference and the evaluation; and a difference evaluation display information generating section 9 which generates composite running curve display information superimposing the planned running curve with the actual running curve and generates difference evaluation list display information listing up the difference evaluation information. <P>COPYRIGHT: (C)2012,JPO&INPIT |