摘要 |
<p>The boiler has walls (2) comprising cooling pipe sections through which a cooling medium i.e. boiling water, with a temperature flows. The walls are connected with each other by a tubular tie rod (10) through which the cooling medium with the temperature flows. The tie rod is arranged over height and/or length of the boiler. The cooling medium for the cooling pipe sections is used as the cooling medium for the tie rod. Binding elements (3) are arranged at an outer side of the walls. One of the binding elements is supported at supporting flanges by a contact plate.</p> |