摘要 |
<p>#CMT# #/CMT# The method involves bonding a metal plate (20) on the steel element (10). A stud hole (41) is pre-drilled in the pile (40) of metal plates and steel element. The fixing element (30) is driven in the pre-drilled stud hole in the pile by a hand-guided tack-driver (60). The used fixing element is a bolt with a blunt head (32). #CMT#USE : #/CMT# Method for attaching a fixing element to a flat steel element such as one or multiple steel sheets. #CMT#ADVANTAGE : #/CMT# The method involves bonding a metal plate on the steel element, where a stud hole is pre-drilled in the pile of metal plates and steel element, and the fixing element is driven in the pre-drilled stud hole in the pile by a hand-guided tack-driver, and hence ensures reliable attachment of the fixing element to a steel structure with small steel thickness or layer thickness. #CMT#DESCRIPTION OF DRAWINGS : #/CMT# The drawing shows a schematic representation of the third step of the attachment method. 10 : Steel element 20 : Metal plate 30 : Fixing element 32 : Blunt head 40 : Pile 41 : Stud hole 60 : Tack-driver.</p> |