<p>During a positive period wherein electric current flows from the power conversion device to a load, a control circuit (11) makes a second snubber capacitor (Crn) be discharged by controlling a second auxiliary switch (Srn) to be ON while a second main diode (Dn) is ON. During a negative period wherein electric current flows from the load to the power conversion device, the control circuit (11) makes a first snubber capacitor (Crp) be discharged by controlling a first auxiliary switch (Srp) to be ON while a first main diode (Dp) is ON.</p>
申请公布号
WO2011036912(A1)
申请公布日期
2011.03.31
申请号
WO2010JP56758
申请日期
2010.04.15
申请人
TOSHIBA MITSUBISHI-ELECTRIC INDUSTRIAL SYSTEMS CORPORATION;HOSOKAWA, YASUHIKO;ISE, TOSHIFUMI;NAKAJI, HIROTAKE