发明名称 |
TERMITE PREVENTION EXECUTION METHOD AND TERMITE PREVENTION TREATMENT TOOL USED THEREFOR |
摘要 |
PROBLEM TO BE SOLVED: To provide a termite prevention execution method and a tool used therefor allowing treatment with a termite prevention agent even in a narrow underfloor space in a foundation heat-insulating structure of a building. SOLUTION: A tunnel-like space 12 surrounded by heat insulating materials 14, 16 is formed along a corner part (a portion of a corner 11) where an inside surface 13a of a continuous footing 13 (an erected part) and an upper face 15a of moisture-proof concrete 15 (a horizontally installed section) join with each other. A long-sized termite-preventing treatment tool 30 is inserted from an opening 12a at the side of the tunnel-like space 12 (an arrow mark D) and inserted into the inner part of the tunnel-like space 12 to sprinkle the liquid termite-preventing agent into the space 12. COPYRIGHT: (C)2010,JPO&INPIT
|
申请公布号 |
JP2010174575(A) |
申请公布日期 |
2010.08.12 |
申请号 |
JP20090020923 |
申请日期 |
2009.01.30 |
申请人 |
KOSHII PRESERVING:KK;SEKISUI HOUSE LTD |
发明人 |
NAKANO TAKASHI;KUBO YUJI;NISHIOKA HISAHIRO;OHATA KOJI;YOSHIMURA SHOJI;TAKAHASHI KAZUTOSHI |
分类号 |
E04B1/72;E02D27/01;E04B1/64 |
主分类号 |
E04B1/72 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|