摘要 |
<P>PROBLEM TO BE SOLVED: To obtain a mechanism for generating a short-term schedule of an operating instruction level as a production flow chart without imposing any burden on a worksite. <P>SOLUTION: This program for making a computer generate the production flow chart of a product is configured to make the computer execute: an extraction step for extracting manufacture instruction information from a database in which manufacture instruction information to instruct the manufacturing operation of a product is stored; and a conversion step for converting the manufacture instruction information into tabular form data. The extraction step includes making the computer extract the start date and end date of the manufacturing process of the product as manufacture instruction information, and the conversion step includes making the computer record information showing a line or an arrow using a start date and end date as a start point and an end point in tabular form data. <P>COPYRIGHT: (C)2010,JPO&INPIT |