摘要 |
<p>The method involves handling elements, such as cable (L1 to L12), pump (P1 to P5), valve (Vt1 to Vt4), mixer, heat exchanger (Wt1) and rectifier. The sensors are fitted in the plant for measuring the operating parameter. The sensors are connected with a display and display control unit, particularly by central regulation of the power engineering plant. The operating conditions and operating parameter, such as flow rates, flow speeds, flow directions, heat flow volumes, energy quantities, light intensities, outputs, speeds, temperatures, current intensities, and voltages are visually depicted. An independent claim is included for a visualization device for monitoring and operating a power engineering plant.</p> |