发明名称 |
METHOD FOR REPAIRING PROTECTIVE TUBE IN WHICH CABLE HAS BEEN LAID |
摘要 |
<p><P>PROBLEM TO BE SOLVED: To obtain a method for repairing a protective tube under a state where a cable has been laid. <P>SOLUTION: After a cable 25 is placed in one split member 2 constituting a tubular repair material 1 on one opening side of a protective tube 22, split face of the other split member 3 is bonded to the split face of the split member 2 to form the tubular repair material 1 which is then inserted into the protective tube 22 from one opening. Subsequently, a next tubular repair material 1 is formed by above-mentioned method and after one opening end of the tubular repair material 1 is connected to the opening end of the tubular repair material 1 previously inserted into the protective tube 22, the tubular repair material 1 is inserted into the protective tube 22, and then the previous tubular repair material 1 is moved to the other opening side of the protective tube 22. The tubular repair material 1 is arranged from one opening end to the other opening end of the protective tube 22 under a state where the cable 25 is passed through the protective tube 22 by repeating the above-mentioned steps repeatedly. <P>COPYRIGHT: (C)2007,JPO&INPIT</p> |
申请公布号 |
JP2007124794(A) |
申请公布日期 |
2007.05.17 |
申请号 |
JP20050313260 |
申请日期 |
2005.10.27 |
申请人 |
NIPPON TELEGR & TELEPH CORP <NTT>;MEESHIKKU:KK;AIREC ENGINEERING CORP;ASAHI TEC CORP |
发明人 |
YAMAGUCHI SHIGERU;OKUMURA KENJI;IMAZAKI YUJI;NAGAOKA TAKAYUKI;HOSAKA AKIRA |
分类号 |
H02G1/06;B29C63/34;B29L23/00;F16L55/16 |
主分类号 |
H02G1/06 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|