发明名称 |
POWER DISTRIBUTION SYSTEM MONITORING CONTROL SYSTEM, METHOD, AND PROGRAM |
摘要 |
<p><P>PROBLEM TO BE SOLVED: To precisely calculate an operation amount of each voltage regulator in consideration of effects of the regulators according to ever-changing states of power distribution lines so as to keep a voltage of the entire power distribution line within a proper range. <P>SOLUTION: A voltage-reactive power optimization calculation means 13 executes the voltage-reactive power optimization calculation to solve a mixed-integer quadratic programming problem so as to minimize a square sum of a difference between a power distribution line voltage and a voltage target value of each voltage management node based on a voltage change amount due to an operation amount of each regulator as a constraint condition while using an operation amount of each voltage regulator as a variable on the basis of state data of each voltage regulator and data of a power distribution line load current and a power distribution line voltage or the like obtained by an input means 12. A power flow distribution computation means 14 computes a power flow distribution of a power distribution system 20 on the basis of the voltage-reactive power optimization calculation result. A convergence determination means 15 determines convergence of a power distribution line voltage of each node whenever repeating the voltage-reactive power optimization calculation and the power flow distribution computation. An output means 16 outputs a combination of operation amounts of each voltage regulator at the point of convergence. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |
申请公布号 |
JP2008278658(A) |
申请公布日期 |
2008.11.13 |
申请号 |
JP20070120187 |
申请日期 |
2007.04.27 |
申请人 |
TOSHIBA CORP |
发明人 |
KOSAKA YOKO;MURAI MASAHIKO;KOBAYASHI TAKENORI;KOSAKATA YUMIKO;KANEKO TAKESHI;OKUDA YASUO;NISHI AKINORI |
分类号 |
H02J13/00;H02J3/00 |
主分类号 |
H02J13/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|