摘要 |
<p><P>PROBLEM TO BE SOLVED: To optimally save power consumption on a compressor by performing forced control at appropriate timing after acquiring the actual operating state of air-conditioning equipment. <P>SOLUTION: How much work has been achieved for a fixed time after the operating state of an outdoor unit 4 of the air-conditioning equipment shifts from the stop to operation or from a low load operating state to a high load operating state is acquired by digitizing, and control is started at the appropriate timing determined by the demand grade of the compressor 8 predicted from the numeric value. <P>COPYRIGHT: (C)2009,JPO&INPIT</p> |