摘要 |
PROBLEM TO BE SOLVED: To efficiently charge a manufacturing line and a packaging line with a game machine body unit without considerably increasing the cost of equipment. SOLUTION: In a factory, a container carrier line 60 for carrying a container body 2 which stores sixteen game machine body units P at the maximum is placed at right angles to a next process conveyer line 70 and a charging part 71 is provided with a lower step conveyer line 72 and an upper step conveyer line 73 whose mounting surfaces become almost as high as upper and lower floor surfaces of the container body 2 which opens side faces. Ahead of the conveyer lines 72 and 73, an elevator 80 rising and lowering with three positions (a lowering position, an intermediate position, and a rising position) as stop positions is provided, and a next process body conveyer line 74 is installed ahead of the intermediate position. By pushers 101 and 102, the game machine body unit P is transferred to the upper and lower conveyer lines 72 and 73 by the charging part 71. COPYRIGHT: (C)2008,JPO&INPIT
|