发明名称 PRE-BORED DISCONNECTED PILE METHOD
摘要 A pre-bored disconnected pile method is provided to save construction cost, by separating a base plate of an upper structure from a pile not to reduce strength of the pile body so much. A pre-bored disconnected pile method includes the steps of: perforating a hole in natural ground(10) using a perforating device, where the natural ground does not satisfy supporting force for structures placed on it and settlement condition; forming a strong pile(11) by placing strong pile material in the hole; forming a hard layer(13) by pouring coarse aggregate on the strong pile and hardening it; and constructing a base plate(3) on the hard layer.
申请公布号 KR20070111604(A) 申请公布日期 2007.11.22
申请号 KR20060044604 申请日期 2006.05.18
申请人 POSCO ENGINEERING & CONSTRUCTION CO., LTD.;KIM, SUNG HO 发明人 MIN, KI HOON;KIM, SUNG HO
分类号 E02D7/00;E02D5/22 主分类号 E02D7/00