摘要 |
PROBLEM TO BE SOLVED: To provide a casting mold molding equipment capable of reducing the installation space, and facilitating the collection work of spilt sand by reducing the places of spilt sand. SOLUTION: A casting mold conveying line for conveying a casting mold and a poured casting mold, and a primary cooling line for cooling the poured casting mold are installed in upper and lower stages, and a secondary cooling line is established along the casting mold conveying line. There are provided a casting mold molding station and a pouring station along the casting mold conveying line, a down-elevating/lowering station for shifting a poured casting mold to a downstream end of the casting mold conveying line, an up-elevating/lowering station for shifting the poured casting mold to a downstream part of the primary cooling line, a casting mold transfer station for transferring the poured casting mold between the up-elevating/lowering station and the casting mold molding station, and a jacket and weight transfer station between the transfer station and the casting mold molding station. COPYRIGHT: (C)2007,JPO&INPIT
|