发明名称 |
CALCULATION METHOD OF EXTRACTION RESISTANCE FORCE OF PILE WITH NODE USING BEARING FORCE ACTING ON INCLINED FACE OF EXPANDED DIAMETER PART, CALCULATION METHOD OF PUSHING-IN RESISTANCE FORCE, DESIGN METHOD OF PILE WITH NODE AND PILE WITH NODE |
摘要 |
PROBLEM TO BE SOLVED: To provide a further highly accurate calculation method of the extraction resistance force of a expanded diameter part for reducing cost and securing safety. SOLUTION: This method calculates the extraction resistance force of a pile 1 with a node having the expanded diameter parts 3 and 4 including an upper side inclined face 8 inclined so that a diameter becomes large toward the lower side; and calculates a limit extraction resistance force shared by the upper side inclined face 8 on the basis of the product of of the horizontal projection area of the upper side inclined face 8 and a component in the vertical direction of a limit bearing force degree. COPYRIGHT: (C)2007,JPO&INPIT
|
申请公布号 |
JP2006322257(A) |
申请公布日期 |
2006.11.30 |
申请号 |
JP20050147771 |
申请日期 |
2005.05.20 |
申请人 |
OHBAYASHI CORP;TOKUSHU KOKOHO KEIKAKU KENKYUSHO:KK |
发明人 |
SEKI TAKAO;CHATANI FUMIO;SEI HIROTOSHI;GOKAN SHOKICHI |
分类号 |
E02D5/22 |
主分类号 |
E02D5/22 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|