摘要 |
<p>The shunting coordination process transmits radio information compatible with European Train Control System levels two and three. A train in a shunting region has a unique protocol containing also data about changes to the train. This is taken from the section control center (1), permitting train changes to be made in the traffic region, with the data of the protocol being updated, ensuring the safety of traffic.</p> |