发明名称 СПОСОБ УСТАНОВКИ В ВЕРТИКАЛЬНОЕ ПОЛОЖЕНИЕ ПАНЕЛЕЙМОРСКОЙ ПЛАТФОРМЫ
摘要 FIELD: oil production, particularly marine oil production hydraulic structures, namely stationary marine platforms. ^ SUBSTANCE: method involves installing one longitudinal tubular member on rotary supports; rotating panel with the use of a number of movable climbing cranes; connecting boom of each climbing crane with corresponding panel members by cords; performing programmed serial straight-line climbing crane motion and panel lifting operations. The rotary supports are made as bodies pivotally connected with lodgment by rotary link. End parts of longitudinal tubular members are installed on the lodgment near minor panel base and connected one with another by weld connection. Movable climbing cranes booms are connected one with another by cords at opposite panel base. Movable climbing crane boom extends obliquely to climbing crane movement direction and the climbing crane is moved in parallel to longitudinal panel axis along trajectory so that climbing crane body is located out of panel projection in plane view in any panel lifting point. ^ EFFECT: reduced labor inputs and increased quality and safety of work to be performed. ^ 4 cl, 7 dwg
申请公布号 RU2004132947(A) 申请公布日期 2006.04.20
申请号 RU20040132947 申请日期 2004.11.12
申请人 ООО "ЛУКОЙЛ-Калининградморнефть" (RU) 发明人 Ершов Борис Ильич (RU);Фомичев В чеслав Андреевич (RU);Каджо н Юрий Степанович (RU);Кузин Анатолий Юрьевич (RU);Романчишин Георгий Алексеевич (RU);Собко Владимир Иванович (RU);Соловь нчик Василий Денисович (RU)
分类号 E02B17/00 主分类号 E02B17/00
代理机构 代理人
主权项
地址