发明名称 GAS TURBINE AND OPERATION METHOD OF GAS TURBINE COMBINED ELECTRIC GENERATING PLANT, GAS TURBINE COMBINED ELECTRIC GENERATING PLANT, AND COMPUTER PRODUCT
摘要 A casing air temperature Ta and a steam temperature Ts are measured, and if an absolute value .DELTA.T of a difference between these two temperatures is within a predetermined temperature, the gas turbine is connected to the generator. After the connection is done, the load is gradually increased, and the coolant changeover signal is sent from a processor to a controller. The coolant is then changed to the steam, thereby completing the connection of the gas turbine with the generator and the changeover of the coolant.
申请公布号 CA2402947(C) 申请公布日期 2006.04.11
申请号 CA20022402947 申请日期 2002.09.12
申请人 MITSUBISHI HEAVY INDUSTRIES, LTD. 发明人 HYAKUTAKE, YOSHINORI;FUJITA, YASUHIRO
分类号 F02C7/16;F01D19/00;F01D19/02;F01D25/12;F01D25/14;F01D25/26;F01K23/10;F02C6/00;F02C7/18 主分类号 F02C7/16