摘要 |
The method involves dressing the surface part of roadway to obtain a milling off material, and preparing a mixture of sand and asphaltic emulsion. The mixture is then mixed with the milling off material to produce a coated material forming a new surface layer. The quantity of sand supplied is comprised between 20 and 40 percent of sand-milling off material mixture.
|