发明名称 PILOT TUNNEL FOR A 2-ARCH TUNNEL CAPABLE OF REDUCING A PERIOD OF CONSTRUCTION BY SECURING A SPACE FOR MOVING CONSTRUCTION MACHINERY FREELY AND INCREASING ADVANCE FOR BLASTING A TUNNEL AND THE CONSTRUCTION METHOD
摘要 PURPOSE: A pilot tunnel for a 2-arch tunnel is provided to improve the bearing effect when blasting a tunnel by supporting a central wall using a rockbolt, to shorten a period of construction by securing a space for moving construction machinery freely and to increase the advance when blasting a tunnel. CONSTITUTION: The pilot tunnel for a 2-arch tunnel comprises primary and secondary pitheads(11) formed on both longitudinal ends of a tunnel, an expansion unit(13) connecting the primary pithead(11) and the secondary pithead, a central wall installed to the center of the pitheads(11) and the expansion unit(13) continuously, and a rockbolt(50) inserted to the upper bedrock of the pilot tunnel and provided with a projection(51) projected partially to the inside of the tunnel. The construction method of the pilot tunnel for a 2-arch tunnel comprises the steps of: constructing pitheads(11) on both ends of a tunnel; constructing an expansion unit(13) between the pitheads(11) to be wider than the width of the pitheads(11); and installing a central wall to the pitheads(11) and the expansion unit(13).
申请公布号 KR20050004534(A) 申请公布日期 2005.01.12
申请号 KR20030044752 申请日期 2003.07.03
申请人 PARK, JAE HYUN 发明人 PARK, JAE HYUN
分类号 E21D9/00;(IPC1-7):E21D9/00 主分类号 E21D9/00
代理机构 代理人
主权项
地址