摘要 |
PROBLEM TO BE SOLVED: To provide a leg body, a scaffolding and a construction method, which enable the scaffolding to be placed on a sub-floor after the construction of a sub-floor material, which enable work in the next process to be performed on the scaffolding during the curing of the sub-floor material, and which enable the scaffolding to be easily recovered after the hardening of the sub-floor material. SOLUTION: The leg body for being used on the sub-floor material is composed of at least one leg part and a plate part, and the leg part is detachably attached to the plate part. The scaffolding and the construction method can also be provided along with the leg body. COPYRIGHT: (C)2004,JPO
|