发明名称 FELLOE-GUARD CONSTRUCTION METHOD FOR BRIDGE AND FELLOE- GUARD FORM USED THEREFOR
摘要 PROBLEM TO BE SOLVED: To provide a felloe-guard construction method, in which the construction period of a felloe-guard construction is shortened while a crack due to the drying shrinkage of concrete is prevented, and felloe-guard forms used therefor. SOLUTION: In the felloe-guard construction method, an embedded bar 90 buried and supported to the outer end section of a main girder 9 in the bridge width direction and exposed to the outside is disposed previously in the bridge longitudinal direction first, felloe-guard bars 5 connected to the embedded bars are arranged while forms 2 in a specified partition containing the embedded bars and the felloe-guard bars are constituted by combining panels 3 and 4 made of precast concrete and connected and fixed to the main girder, and concrete 8 is placed in the forms and unified with the forms, thus forming a felloe guard 1. The felloe-guard forms used therefor are composed of the embedded bars disposed to the main girder, the felloe-guard bars connected to the embedded bars and arranged and the panels made of precast concrete constituting the forms in the specified partition containing the embedded bars and the felloe-guard bars and being connected and fixed to the side end section of the main girder as mentioned above. COPYRIGHT: (C)2004,JPO
申请公布号 JP2003336219(A) 申请公布日期 2003.11.28
申请号 JP20020148502 申请日期 2002.05.23
申请人 JOBAN KOSAN KK 发明人 SUZUKI EIICHI;ASANUMA SHIROSHI;YANAGIDA SEIICHI
分类号 E01D19/10;E01D19/00;(IPC1-7):E01D19/10 主分类号 E01D19/10
代理机构 代理人
主权项
地址