发明名称 |
METHOD FOR AUTOMATICALLY MANAGING DEVELOPMENT PROJECT FILE IN NETWORK ENVIRONMENT, COMPUTER SYSTEM AND PROGRAM |
摘要 |
PROBLEM TO BE SOLVED: To provide project schedule management technology based upon the total of individual operation schedules. SOLUTION: An individual operation schedule is updated according to inspection results from two or more supervisors who inspect a project operation product. The schedule and its update are controlled on the basis of the policy that part of the operation is not completed. The inspection results are linked with the individual operation schedule linked with a related project schedule. A project file is managed through a network. As a project is proposed, an individual site for project participants is created and the individual operation schedule and a draft project file are linked with the individual site. The individual site is linked with a projector site as well and a related file directory is created and linked with the project site. |
申请公布号 |
JP2003058685(A) |
申请公布日期 |
2003.02.28 |
申请号 |
JP20020171575 |
申请日期 |
2002.06.12 |
申请人 |
RICOH CO LTD |
发明人 |
MOTOYAMA TETSURO |
分类号 |
G06F9/44;G06Q10/06;G06Q10/10 |
主分类号 |
G06F9/44 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|