发明名称 Handling unscheduled tasks in a scheduling process
摘要 Tasks (T) such as repair jobs on a telecommunications system, that are to be performed by a plurality of resources such as field engineers (E), at different locations in a geographical area (2), are scheduled by means of a scheduler (10) at a work manager server (5). The scheduler provides schedule data (11) corresponding to schedules of the tasks that individual ones of the resources are to carry out, from task data (4) concerning the tasks to be carried out and resource data (6) concerning characteristics of resources available to carry out the tasks over a given period. Not all the tasks are scheduled, resulting in unscheduled task data (11a). The schedule data (11) is downloaded to a workstation (7) together with the unscheduled task data. The downloaded data is analysed at the workstation to determine a candidate resource (E) to perform the task (T) corresponding to the unscheduled task data.
申请公布号 US2003041087(A1) 申请公布日期 2003.02.27
申请号 US20020239087 申请日期 2002.09.19
申请人 POTHOS DIONISIOS;LAITHWAITE ROBERT;ALLETSON IAN S 发明人 POTHOS DIONISIOS;LAITHWAITE ROBERT;ALLETSON IAN S
分类号 G06Q10/00;(IPC1-7):G06F9/00;G06F9/44 主分类号 G06Q10/00
代理机构 代理人
主权项
地址