发明名称 |
MELTING FURNACE FOR GASIFYING MELTING FURNACE FACILITY AND METHOD OF SUPPLYING COMBUSTION GAS TO THE MELTING FURNACE |
摘要 |
PROBLEM TO BE SOLVED: To provide a melting furnace for gasifying melting furnace facility in which a combustion gas nozzle and a primary combustion chamber are not blocked by clinkers adhering to the internal surface of the top part of the furnace and which makes the stable continuous operation of a gasifying melting furnace facility possible, and to provide a method of supplying combustion gas to the furnace. SOLUTION: The gasifying melting furnace facility gasifies wastes in a gasifying furnace and melts the ash contained in the generated gas (b) into slag by introducing the gas (b) to the melting furnace 3. The furnace 3 is provided with a gas inlet 20 through which the gas (b) is introduced into the furnace 3 in the form of a swirling gas flow in its upper side wall, a plurality of combustion gas supply nozzles 24 and 25 which are opened in the side wall and top wall of the furnace 3, and a combustion gas blowing means which blows a combustion gas (f) into the swirling gas flow through the nozzles 24 and 25.
|
申请公布号 |
JP2003004214(A) |
申请公布日期 |
2003.01.08 |
申请号 |
JP20010195269 |
申请日期 |
2001.06.27 |
申请人 |
EBARA CORP |
发明人 |
ISHIKAWA RYUICHI;ENDO HIDEKAZU;CHO HIROMITSU |
分类号 |
F23G5/24;B09B3/00;F23C7/02;F23G5/027;F23G5/16;F23G5/32;F23G5/44;F23G5/50;F23J1/00;F23J9/00;F27D7/02;(IPC1-7):F23G5/24 |
主分类号 |
F23G5/24 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|