发明名称 Method of controlling proppant flowback in a well
摘要 Hydrocarbons are obtained from a fractured formation by pumping particulate proppant through a perforated casing (10) into the fractures, installing an expandable screen (22) in the casing (10), expanding the screen in the casing, the screen mesh being such as to block proppant flowback from the fractures whilst maximising hydrocarbon production. <IMAGE> <IMAGE> <IMAGE>
申请公布号 AU3825602(A) 申请公布日期 2002.11.21
申请号 AU20020038256 申请日期 2002.05.08
申请人 HALLIBURTON ENERGY SERVICES, INC. 发明人 PHILIP D. NGUYEN
分类号 E21B43/02;E21B43/08;E21B43/10;E21B43/267 主分类号 E21B43/02
代理机构 代理人
主权项
地址