发明名称 |
CONFIRMING METHOD OF PILE SUPPORTING FORCE |
摘要 |
PROBLEM TO BE SOLVED: To beneficially effectively carry out a supporting force confirmation test of a pile although it depends on a static pile head loading test and remarkably reduce the term of driving the pile including the test teerm. SOLUTION: After a pile is driven by a driving machine 2, a loading test is given for a specified time on the pile head by the driving machine 2 and the settling length of the pile is measured by the loading weight.
|
申请公布号 |
JP2002069992(A) |
申请公布日期 |
2002.03.08 |
申请号 |
JP20000256522 |
申请日期 |
2000.08.25 |
申请人 |
DAIWA HOUSE IND CO LTD;PORTA- SEIZO KK |
发明人 |
IKEDA MOTOYUKI;HIRATA SHIGEYOSHI;HORIZONO YOSHIAKI;ISODA KIKUO |
分类号 |
E02D1/00;E02D33/00;(IPC1-7):E02D1/00 |
主分类号 |
E02D1/00 |
代理机构 |
|
代理人 |
|
主权项 |
|
地址 |
|