发明名称 CONFIRMING METHOD OF PILE SUPPORTING FORCE
摘要 PROBLEM TO BE SOLVED: To beneficially effectively carry out a supporting force confirmation test of a pile although it depends on a static pile head loading test and remarkably reduce the term of driving the pile including the test teerm. SOLUTION: After a pile is driven by a driving machine 2, a loading test is given for a specified time on the pile head by the driving machine 2 and the settling length of the pile is measured by the loading weight.
申请公布号 JP2002069992(A) 申请公布日期 2002.03.08
申请号 JP20000256522 申请日期 2000.08.25
申请人 DAIWA HOUSE IND CO LTD;PORTA- SEIZO KK 发明人 IKEDA MOTOYUKI;HIRATA SHIGEYOSHI;HORIZONO YOSHIAKI;ISODA KIKUO
分类号 E02D1/00;E02D33/00;(IPC1-7):E02D1/00 主分类号 E02D1/00
代理机构 代理人
主权项
地址