发明名称 SCHEDULE CONTROL SYSTEM CORRESPONDING TO TEMPORARILY AND DETERMINED SCHEDULED DATE
摘要 PROBLEM TO BE SOLVED: To speedily deal with the change of a construction schedule and to make schedule control business efficient. SOLUTION: The schedule control system is a system to register, update and delete respective pieces of data accumulated in a server computer from a client computer, and to output the progress situation of construction on screen and a form and to control the schedule. Scheduled date data for registering the scheduled date of construction and result date data for registering the date when construction is actually preformed after construction are set as data of the construction schedule. Scheduled date data are constituted of temporarily setting scheduled date data which is temporarily set and can be rewritten at any time and determined scheduled date data where the determined date is registered and the rewriting and deletion of the date are inhibited after registration. A progress situation list is outputted base on scheduled date data which is temporarily set, determined scheduled date data and result date data.
申请公布号 JP2002024326(A) 申请公布日期 2002.01.25
申请号 JP20000208475 申请日期 2000.07.10
申请人 SEKISUI HOUSE LTD 发明人 SAKAGUCHI KAZUTO;HIRANO YOSHITAKA;OMURA MARIKO
分类号 E04G21/00;G06F3/00;G06F3/048;G06Q10/00;G06Q10/06;G06Q50/00;G06Q50/08 主分类号 E04G21/00
代理机构 代理人
主权项
地址